2009 October

October 29, 2009

Sunflower Trail Good for Crossing River

October 23, Sunflower Trail: Thanks to a Tijuana River clean up sponsored by WildCoast, the Sunflower Trail is wide, sandy, dry, and clean. Use it to bypass the bridges to cross the river while tractors are dredging near the Effie May Crossing. After the first moderate rain, this trail will close because the river will begin to

October 16, 2009

River Work Heavy Equipment – Horse Detour

The Storm Water Dept will work 7 days a week from 6:00am to 6:00pm to clear Smuggler’s Gulch and the main channel of the Tijuana River west of Hollister St.  Work should complete by February 2010. Trails will be blocked during this work to keep horses and riders safe from fast-moving heavy equipment.  Horse detour signs have been posted and affected trails will